Phone 021-64863398

News

Policies and Regulations

Shanghai tax firm Li & Fung Ltd.
Address: Zhongshan West Road 2368,  Huading Building 10 floor,room D      Postal Code: 200235
Company switchboard: 021-64861516
Business Phone: Teacher Tan 64,863,398*13,391,115,013  / Teacher Chen 34,698,775 
Supervision Tel: Teacher Yao 64872271/13901903781

Your location:Home > Policies and Regulations >

Financial policies and regulationsList

Chengshiguanwang special funds Interim Measures


On the issuance of "special Chengshiguanwang fund management Interim Measures," the

Cai Jian [2015] No. 201
Provinces, autonomous regions, municipalities, separately listed cities (bureaus), Housing and Urban Construction Department (Commission), the Xinjiang Production and Construction Corps Finance Bureau, Construction Bureau:
In order to implement the strategic plan since the party's 18 on urban construction and new urbanization, promoting pipe network of sewage treatment facilities, and underground cities sponge Pipe Gallery project, build urban ecological space, enhance the city's comprehensive carrying capacity, improve capital efficiency, according to "People's Republic of China budget law" and "the State Council on strengthening the urban infrastructure of opinions" (Guo Fa [2013] No. 36), we have developed a "distribution network special funds Interim Measures." Are hereby issued, please follow.
Annex: Interim Measures for the Administration of Special Funds Chengshiguanwang
Ministry of Housing and Urban Construction
June 1, 2015
annex:
Chengshiguanwang special funds Interim Measures
Order to standardize and strengthen the distribution network of special funds management, improve effective use of finances, according to "People's Republic of China Budget Law" and the "State Council on strengthening urban infrastructure" (Guo Fa [2013] No. 36), formulated.
The second term of the distribution network of special funds (hereinafter referred to as special funds), it is through the central budget to support the distribution network construction, urban underground space intensive use, urban water drainage waterlogging and ecological restoration of urban ecology special funds for space construction.
Third special funds for the implementation of earmarking, special management.
Article IV of special funds from the Ministry of Finance, the Ministry of Housing and Urban Construction Management.
Article special funds to support the following:
(A) urban sewage treatment facilities and supporting pipe network construction of sewage pumping station;
(B) sponges urban pilot;
(Iii) underground pipeline gallery pilot;
(Iv) construction of urban ecological space of other matters need to be supported.
Article taken special funds allocated in different ways depending on the support issues.
Support urban sewage treatment facilities and supporting pipe network construction matters sewage pumping station, according to the annual size of funds and the completion of construction tasks and other areas related to reward.
Sponge for the city, underground pipeline construction gallery pilot demonstration class matters, through a competitive evaluation, etc., to determine the scope of support, the support arrangements for the period up prize money.
Article Ministry of Finance, the Ministry of Housing and Urban Construction and other related departments to support key areas according to the annual nationally determined, organizing local reporting, and review throughout the disclosure program.
The main duties of Article VIII of the relevant departments of local finance and urban and rural housing construction include:
(A) is responsible for the implementation of local support policies and measures to be borne by the funds;
(B) the provision of special funds to declare the organization, verify and provide related materials;
(Iii) required to manage and use special funds allocated by the central, organizing the implementation of the relevant work, the implementation of tasks.
Article IX of special funds use of incentives, grants and other ways to support it. Accordance with the regulations of the use of government and social capital cooperation (PPP) mode projects to be inclined to support.
Article X pay special funds shall be implemented in accordance with the relevant provisions of the State's financial management systems. Belong to the scope of government procurement management, it should be implemented in accordance with the provisions of the relevant national government procurement. The introduction of social capital belong to the scope of management, it should be implemented in accordance with the provisions of the relevant government and social cooperation at the national capital.
Article XI Ministry of Finance, the Ministry of Housing and Urban Construction and other related departments to develop performance evaluation practices, organization and implementation of local performance appraisal, and based on performance evaluation results Jiangyoufalie. For the performance evaluation results better achieve the objectives of reward; for performance evaluation result is poor, unable to achieve the objectives of the establishment of exit mechanism, and to recover the central finance.
Article XII of the local financial department in conjunction with Housing and Urban Construction and other relevant departments in accordance with the division of responsibilities, organization and implementation of the work and the use of funds to conduct supervision and inspection.
Article 13 No unit or individual is allowed to cheat, interception, misappropriation of special funds, special funds may not be used to repay existing debt. Violators of the provision in accordance with the relevant provisions of the "financial penalties for violations sanctions regulations" and other legal liability.
Article 14 These Measures by the Ministry of Finance, the Ministry of Housing and Urban Construction responsible for the interpretation.
Article 15 These Measures shall come into force from the date of publication. May 23, 2011 issued the "Ministry of Housing and Urban Construction on the issuance of <" second five "urban sewage treatment facilities supporting pipe network construction project fund management approach" notice "(Finance Building [2011] No. 266) at the same time abolished. 

Shanghai Lifeng Tax Agent Co., Ltd
Tel: 021-64863398

沪公网安备 31010402004443号